All the models are equipped with all the necessary devices to make easier the erection of the same:
- Anchor ramp to be used for fixing the anchor bolts directly at the wall
- Customized basement bolts to easy position the hoist at the ground
- Remote control keyboard that exclude all the control functions from the hoist and command the machine even from the roof of the construction hoist
- Protection guardrails either on the erection ramp for the loading hoist or at the roof of the construction hoist
- Electric power socket on board 220V to supply hand tools such as hand drill for the erection
- Manual crane or electric, to erect on the top of the machine to raise the mast sections during the erection
- Test remote control with 15 meter cable to remotely command the hoists of all types during the parachute test control